top of page
Stoney Trail Bridge, Calgary, Alberta
Joseph Hanna spearheaded the Stoney Trail Bridge project, entailing the design and construction of a 476-meter-long, twenty-meter-wide bridge over the Bow River as part of Calgary’s Stoney Trail N.W. dual carriage-way bypass. Utilizing the incrementally launched method for pre-cast concrete bridges, the double-cell box structure was cast in two stages. The project also featured a 130-meter-long, three-meter-wide pedestrian suspension bridge underhung from the substructure at piers 2 and 3. Hanna’s leadership ensured the successful completion of this complex infrastructure project.
Project type
Trail Bridge
Date
March 2000
Location
Calgary, Alberta

01
Stoney Trail Bridge, Calgary, Alberta

01
stoney trail bridge

02
stoney trail bridge 1

03
RC-20-09-21-south-bow-bridge

04
bow-bridge-looking-north
bottom of page